This MedLibrary.org supplementary page on Iterative and incremental development is provided directly from the open source Wikipedia as a service to our readers. Please see the note below on authorship of this content, as well as the Wikipedia usage guidelines. To search for other content from our encyclopedia supplement, please use the form below:
Related Sponsors
Iterative and Incremental development is a cyclic software development process developed in response to the weaknesses of the waterfall model. It starts with an initial planning and ends with deployment with the cyclic interaction in between.
| Software development process | |
| Activities and steps | |
|---|---|
| Requirements · Specification Architecture · Design Implementation · Testing Deployment · Maintenance |
|
| Models | |
| Agile · Cleanroom · DSDM Iterative · RAD · RUP · Spiral Waterfall · XP · Scrum · V-Model |
|
| Supporting disciplines | |
| Configuration management Documentation Quality assurance (SQA) Project management User experience design |
|
| Tools | |
| Compiler · Debugger · Profiler GUI designer Integrated development environment |
|
The iterative and incremental development is an essential part of the Rational Unified Process, the Dynamic Systems Development Method, Extreme Programming and generally the agile software development frameworks.
Contents |
Overview
Incremental development is a scheduling and staging strategy, in which the various parts of the system are developed at different times or rates, and integrated as they are completed. It does not imply, require nor preclude iterative development or waterfall development - both of those are rework strategies. The alternative to incremental development is to develop the entire system with a "big bang" integration.
Iterative development is a rework scheduling strategy in which time is set aside to revise and improve parts of the system. It does not presuppose incremental development, but works very well with it. A typical difference is that the output from an increment is not necessarily subject to further refinement, and its testing or user feedback is not used as input for revising the plans or specifications of the successive increments. On the contrary, the output from an iteration is examined for modification, and especially for revising the targets of the successive iterations.clarify
The two terms were merged in practical use in the mid-1990s. The authors of the Unified Process (UP) and the Rational Unified Process (RUP) selected the term "iterative development", and "iterations" to generally mean any combination of incremental and iterative development. Most people saying "iterative" development mean that they do both incremental and iterative development. Some project teams get into trouble by doing only one and not the other without realizing it.
Development topics
The Basic idea
The basic idea behind iterative enhancement is to develop a software system incrementally, allowing the developer to take advantage of what was being learned during the development of earlier, incremental, deliverable versions of the system. Learning comes from both the development and use of the system, where possible. Key steps in the process were to start with a simple implementation of a subset of the software requirements and iteratively enhance the evolving sequence of versions until the full system is implemented. At each iteration, design modifications are made and new functional capabilities are added.
The Procedure itself consists of the Initialization step, the Iteration step, and the Project Control List. The initialization step creates a base version of the system. The goal for this initial implementation is to create a product to which the user can react. It should offer a sampling of the key aspects of the problem and provide a solution that is simple enough to understand and implement easily. To guide the iteration process, a project control list is created that contains a record of all tasks that need to be performed. It includes such items as new features to be implemented and areas of redesign of the existing solution. The control list is constantly being revised as a result of the analysis phase.
The iteration involves the redesign and implementation of a task from project control list, and the analysis of the current version of the system. The goal for the design and implementation of any iteration is to be simple, straightforward, and modular, supporting redesign at that stage or as a task added to the project control list. The level of design detail is not dictated by the interactive approach. In a light-weight iterative project the code may represent the major source of documentation of the system; however, in a mission-critical iterative project a formal Software Design Document may be used. The analysis of an iteration is based upon user feedback, and the program analysis facilities available. It involves analysis of the structure, modularity, usability, reliability, efficiency, & achievement of goals. The project control list is modified in light of the analysis results.
Iterative development
Iterative development slices the deliverable business value (system functionality) into iterations. In each iteration a slice of functionality is delivered through cross-discipline work, starting from the model/requirements through to the testing/deployment. The unified process groups iterations into phases: inception, elaboration, construction, and transition.
- Inception identifies project scope, risks, and requirements (functional and non-functional) at a high level but in enough detail that work can be estimated.
- Elaboration delivers a working architecture that mitigates the top risks and fulfills the non-functional requirements.
- Construction incrementally fills-in the architecture with production-ready code produced from analysis, design, implementation, and testing of the functional requirements.
- Transition delivers the system into the production operating environment.
Each of the phases may be divided into 1 or more iterations, which are usually time-boxed rather than feature-boxed. Architects and analysts work one iteration ahead of developers and testers to keep their work-product backlog full.
Waterfall vs. Iterative Development
Waterfall development completes the project-wide work-products of each discipline in a single step before moving on to the next discipline in the next step. Business value is delivered all at once, and only at the very end of the project.
Implementation guidelines
Guidelines that drive the implementation and analysis include:
- Any difficulty in design, coding and testing a modification should signal the need for redesign or re-coding.
- Modifications should fit easily into isolated and easy-to-find modules. If they do not, some redesign is needed.
- Modifications to tables should be especially easy to make. If any table modification is not quickly and easily done, redesign is indicated.
- Modifications should become easier to make as the iterations progress. If they are not, there is a basic problem such as a design flaw or a proliferation of patches.
- Patches should normally be allowed to exist for only one or two iterations. Patches may be necessary to avoid redesigning during an implementation phase.
- The existing implementation should be analysed frequently to determine how well it measures up to project goals.
- Program analysis facilities should be used whenever available to aid in the analysis of partial implementations.
- User reaction should be solicited and analysed for indications of deficiencies in the current implementation.
See also
- Rapid application development
- Dynamic Systems Development Method
- Extreme Programming
- Kaizen
- Rational Unified Process
- Unified Process
- Interaction Design
- OpenUP/Basic
- Object-oriented analysis and design
References
This page is extensively based on:
- http://c2.com/cgi/wiki/wiki?HistoryOfIterative
- http://alistair.cockburn.us/index.php/Incremental_versus_iterative_development
| This article needs additional citations for verification. Please help improve this article by adding reliable references. Unsourced material may be challenged and removed. (October 2008) |
External links
- Going round and round and getting nowhere eXtremely fast? Another look at incremental & iterative development from www.methodsandtools.com
- The “Case” for Waterfall Development from www.fromthetrench.com
- Iterative Development and The Leaning Tower of Pisa from www.fromthetrench.co
|
||||||||||||||||||||
Wikipedia content modification information:
- This page was last modified on 26 October 2008, at 00:27.
Wikipedia Authorship and Review
Wikipedia content provided here is not reviewed directly by MedLibrary.org. Wikipedia content is authored by an open community of volunteers and is not produced by or in any way affiliated with MedLibrary.org.
Wikipedia Usage Guidelines
This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article on "Iterative and incremental development".
The URL for this specific entry is:
All Wikipedia text is available under the terms of the GNU Free Documentation License. (See Copyrights for details). Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.